Comments | 13 | 8/7/2012 | REINF STEEL-COLUMNS | PASS (Full) | | 036 |
Comments | 14 | 8/10/2012 | REINF STEEL-SLAB | PASS (Full) | | 061 |
Comments | 9 | 8/14/2012 | REINF STEEL-BEAMS | PASS (Full) | | 009 |
Comments | 14 | 8/14/2012 | REINF STEEL-COLUMNS | PASS (Full) | | 037 |
Comments | 11 | 8/15/2012 | REINF STEEL-BEAMS | PASS (Full) | | 011 |
Comments | 17 | 9/24/2012 | REINF STEEL-SLAB | PASS (Full) | | 064 |
Comments | 21 | 10/15/2012 | REINF STEEL-SLAB | PASS (Full) | | 068 |
Comments | 17 | 10/19/2012 | REINF STEEL-BEAMS | PASS (Full) | | 017 |
Comments | 18 | 10/24/2012 | REINF STEEL-BEAMS | PASS (Full) | | 018 |
Comments | 4 | 10/24/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 098 |
Comments | 5 | 10/24/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 099 |
Comments | 6 | 10/24/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 100 |
Comments | 1 | 11/20/2012 | REINF STEEL-ROOF SLAB | PASS (Full) | | 191 |
Comments | 7 | 12/13/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 101 |
Comments | 8 | 12/13/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 102 |
Comments | 9 | 12/13/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 103 |
Comments | 11 | 12/18/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 105 |
Comments | 12 | 12/18/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 106 |
Comments | 13 | 12/20/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 107 |
Comments | 14 | 12/21/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 108 |
Comments | 15 | 12/27/2012 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 109 |
Comments | 16 | 1/16/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 110 |
Comments | 12 | 1/30/2013 | REINF STEEL-BEAMS | PASS (Full) | | 012 |
Comments | 13 | 1/30/2013 | REINF STEEL-BEAMS | PASS (Full) | | 013 |
Comments | 16 | 1/30/2013 | REINF STEEL-SLAB | PASS (Full) | | 063 |
Comments | 17 | 2/1/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 111 |
Comments | 18 | 2/1/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 112 |
Comments | 19 | 2/1/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 113 |
Comments | 20 | 2/1/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 114 |
Comments | 1 | 2/1/2013 | REINF STEEL-ROOF SLAB | PASS (Full) | | 193 |
Comments | 19 | 2/4/2013 | REINF STEEL-BEAMS | PASS (Full) | | 019 |
Comments | 20 | 2/4/2013 | REINF STEEL-BEAMS | PASS (Full) | | 020 |
Comments | 13 | 2/4/2013 | REINF STEEL-SLAB | PASS (Full) | | 060 |
Comments | 3 | 2/4/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 097 |
Comments | 21 | 2/4/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 115 |
Comments | 3 | 2/5/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 074 |
Comments | 4 | 2/5/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 075 |
Comments | 10 | 2/5/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 104 |
Comments | 22 | 2/5/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 116 |
Comments | 23 | 2/5/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 117 |
Comments | 1 | 2/7/2013 | REINF STEEL-PARAPET COLUMNS & CAP | PASS (Full) | | 192 |
Comments | 2 | 2/15/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 096 |
Comments | 5 | 2/27/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 076 |
Comments | 10 | 2/27/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 081 |
Comments | 4 | 3/11/2013 | REINF STEEL-SLAB | PASS (Full) | | 051 |
Comments | 13 | 3/22/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 084 |
Comments | 15 | 3/22/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 086 |
Comments | 3 | 4/9/2013 | REINF STEEL-SLAB | PASS (Full) | | 050 |
Comments | 3 | 4/18/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 026 |
Comments | 4 | 4/18/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 027 |
Comments | 5 | 4/18/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 028 |
Comments | 6 | 4/18/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 029 |
Comments | 7 | 4/24/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 030 |
Comments | 8 | 4/24/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 031 |
Comments | 9 | 4/24/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 032 |
Comments | 7 | 5/10/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 170 |
Comments | 9 | 5/10/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 172 |
Comments | 7 | 5/22/2013 | INSULATION | PASS (Full) | | 147 |
Comments | 8 | 5/22/2013 | INSULATION | PASS (Full) | | 148 |
Comments | 9 | 5/22/2013 | INSULATION | PASS (Full) | | 149 |
Comments | 10 | 5/22/2013 | INSULATION | PASS (Full) | | 150 |
Comments | 11 | 5/22/2013 | INSULATION | PASS (Full) | | 151 |
Comments | 14 | 5/22/2013 | INSULATION | PASS (Full) | | 154 |
Comments | 16 | 5/22/2013 | INSULATION | PASS (Full) | | 156 |
Comments | 17 | 5/22/2013 | INSULATION | PASS (Full) | | 157 |
Comments | 18 | 5/22/2013 | INSULATION | PASS (Full) | | 158 |
Comments | 17 | 5/23/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 088 |
Comments | 18 | 5/30/2013 | DRYWALL | PASS (Full) | | 135 |
Comments | 14 | 7/2/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 085 |
Comments | 19 | 7/2/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 090 |
Comments | 4 | 7/3/2013 | INSULATION | PASS (Full) | | 144 |
Comments | 6 | 7/3/2013 | INSULATION | PASS (Full) | | 146 |
Comments | 12 | 7/3/2013 | INSULATION | PASS (Full) | | 152 |
Comments | 13 | 7/3/2013 | INSULATION | PASS (Full) | | 153 |
Comments | 11 | 7/5/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 082 |
Comments | 12 | 7/5/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 083 |
Comments | 1 | 7/5/2013 | DOOR/WINDOW BUCK ATTACHMENT | PASS (Full) | | 095 |
Comments | 6 | 7/5/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 169 |
Comments | 13 | 7/9/2013 | DRYWALL | PASS (Full) | | 130 |
Comments | 4 | 7/9/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 167 |
Comments | 1 | 7/18/2013 | FIRE PUMP - FINAL | PASS (Full) | MARK FRITZ | 219 |
Comments | 15 | 7/19/2013 | DRYWALL | PASS (Full) | | 132 |
Comments | 2 | 7/22/2013 | DRYWALL | PASS (Full) | | 119 |
Comments | 21 | 7/23/2013 | REINF STEEL-BEAMS | PASS (Full) | | 021 |
Comments | 8 | 7/23/2013 | DRYWALL | PASS (Full) | | 125 |
Comments | 12 | 7/23/2013 | DRYWALL | PASS (Full) | | 129 |
Comments | 11 | 7/23/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 174 |
Comments | 17 | 7/24/2013 | DRYWALL | PASS (Full) | | 134 |
Comments | 3 | 7/25/2013 | INSULATION | PASS (Full) | | 143 |
Comments | 10 | 7/26/2013 | REINF STEEL-BEAMS | PASS (Full) | | 010 |
Comments | 3 | 7/26/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 166 |
Comments | 22 | 7/29/2013 | REINF STEEL-BEAMS | PASS (Full) | | 022 |
Comments | 23 | 7/29/2013 | REINF STEEL-BEAMS | PASS (Full) | | 023 |
Comments | 11 | 7/29/2013 | DRYWALL | PASS (Full) | | 128 |
Comments | 20 | 7/30/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 043 |
Comments | 22 | 7/30/2013 | REINF STEEL-SLAB | PASS (Full) | | 069 |
Comments | 5 | 7/30/2013 | DRYWALL | PASS (Full) | | 122 |
Comments | 5 | 7/30/2013 | INSULATION | PASS (Full) | | 145 |
Comments | 8 | 7/30/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 171 |
Comments | 10 | 7/30/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 173 |
Comments | 10 | 7/31/2013 | DRYWALL | PASS (Full) | | 127 |
Comments | 16 | 7/31/2013 | DRYWALL | PASS (Full) | | 133 |
Comments | 15 | 7/31/2013 | INSULATION | PASS (Full) | | 155 |
Comments | 13 | 7/31/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 176 |
Comments | 16 | 7/31/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 179 |
Comments | 18 | 7/31/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 181 |
Comments | 6 | 8/2/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 077 |
Comments | 7 | 8/2/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 078 |
Comments | 8 | 8/2/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 079 |
Comments | 9 | 8/2/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 080 |
Comments | 4 | 8/2/2013 | DRYWALL | PASS (Full) | | 121 |
Comments | 17 | 8/2/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 180 |
Comments | 1 | 8/2/2013 | REINF STEEL-SLAB(SOIL POISONING?) | PASS (Full) | | 189 |
Comments | 1 | 8/2/2013 | REINF STEEL-PARAPET COLUMNS & CAP | PASS (Full) | | 194 |
Comments | 3 | 8/12/2013 | DRYWALL | PASS (Full) | | 120 |
Comments | 6 | 8/15/2013 | DRYWALL | PASS (Full) | | 123 |
Comments | 7 | 8/15/2013 | DRYWALL | PASS (Full) | | 124 |
Comments | 9 | 8/15/2013 | DRYWALL | PASS (Full) | | 126 |
Comments | 12 | 8/15/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 175 |
Comments | 1 | 8/16/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 164 |
Comments | 2 | 8/19/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 025 |
Comments | 17 | 8/19/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 040 |
Comments | 18 | 8/19/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 041 |
Comments | 19 | 8/19/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 042 |
Comments | 21 | 8/19/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 044 |
Comments | 2 | 8/19/2013 | REINF STEEL-SLAB | PASS (Full) | | 049 |
Comments | 18 | 8/19/2013 | REINF STEEL-SLAB | PASS (Full) | | 065 |
Comments | 19 | 8/19/2013 | REINF STEEL-SLAB | PASS (Full) | | 066 |
Comments | 20 | 8/19/2013 | REINF STEEL-SLAB | PASS (Full) | | 067 |
Comments | 2 | 8/20/2013 | REINF STEEL-BEAMS | PASS (Full) | | 002 |
Comments | 22 | 8/20/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 045 |
Comments | 23 | 8/20/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 046 |
Comments | 23 | 8/20/2013 | REINF STEEL-SLAB | PASS (Full) | | 070 |
Comments | 1 | 8/20/2013 | REINF STEEL-MONO SLAB/FTG (SOIL POISON) | PASS (Full) | | 071 |
Comments | 1 | 8/20/2013 | DRYWALL | PASS (Full) | | 118 |
Comments | 5 | 8/20/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 168 |
Comments | 6 | 8/21/2013 | REINF STEEL-BEAMS | PASS (Full) | | 006 |
Comments | 7 | 8/21/2013 | REINF STEEL-BEAMS | PASS (Full) | | 007 |
Comments | 14 | 8/21/2013 | REINF STEEL-BEAMS | PASS (Full) | | 014 |
Comments | 15 | 8/21/2013 | REINF STEEL-BEAMS | PASS (Full) | | 015 |
Comments | 16 | 8/21/2013 | REINF STEEL-BEAMS | PASS (Full) | | 016 |
Comments | 1 | 8/21/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 024 |
Comments | 12 | 8/21/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 035 |
Comments | 15 | 8/21/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 038 |
Comments | 16 | 8/21/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 039 |
Comments | 12 | 8/21/2013 | REINF STEEL-SLAB | PASS (Full) | | 059 |
Comments | 15 | 8/21/2013 | REINF STEEL-SLAB | PASS (Full) | | 062 |
Comments | 1 | 8/21/2013 | INSULATION | PASS (Full) | | 141 |
Comments | 15 | 8/21/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 178 |
Comments | 1 | 8/21/2013 | EMERGENCY GENERATOR - FINAL | PASS (Full) | | 218 |
Comments | 1 | 8/22/2013 | REINF STEEL-BEAMS | PASS (Full) | | 001 |
Comments | 3 | 8/22/2013 | REINF STEEL-BEAMS | PASS (Full) | | 003 |
Comments | 4 | 8/22/2013 | REINF STEEL-BEAMS | PASS (Full) | | 004 |
Comments | 5 | 8/22/2013 | REINF STEEL-BEAMS | PASS (Full) | | 005 |
Comments | 8 | 8/22/2013 | REINF STEEL-BEAMS | PASS (Full) | | 008 |
Comments | 10 | 8/22/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 033 |
Comments | 11 | 8/22/2013 | REINF STEEL-COLUMNS | PASS (Full) | | 034 |
Comments | 1 | 8/22/2013 | REINF STEEL-FOUNDATION | PASS (Full) | | 047 |
Comments | 1 | 8/22/2013 | REINF STEEL-SLAB | PASS (Full) | | 048 |
Comments | 5 | 8/22/2013 | REINF STEEL-SLAB | PASS (Full) | | 052 |
Comments | 6 | 8/22/2013 | REINF STEEL-SLAB | PASS (Full) | | 053 |
Comments | 7 | 8/22/2013 | REINF STEEL-SLAB | PASS (Full) | | 054 |
Comments | 8 | 8/22/2013 | REINF STEEL-SLAB | PASS (Full) | | 055 |
Comments | 9 | 8/22/2013 | REINF STEEL-SLAB | PASS (Full) | | 056 |
Comments | 10 | 8/22/2013 | REINF STEEL-SLAB | PASS (Full) | | 057 |
Comments | 11 | 8/22/2013 | REINF STEEL-SLAB | PASS (Full) | | 058 |
Comments | 1 | 8/22/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 072 |
Comments | 2 | 8/22/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 073 |
Comments | 16 | 8/22/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 087 |
Comments | 18 | 8/22/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 089 |
Comments | 20 | 8/22/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 091 |
Comments | 21 | 8/22/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 092 |
Comments | 22 | 8/22/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 093 |
Comments | 23 | 8/22/2013 | DR/WINDOW ATTACHMENT (ENG/PROD APRV REQ) | PASS (Full) | | 094 |
Comments | 2 | 8/22/2013 | INSULATION | PASS (Full) | | 142 |
Comments | 2 | 8/22/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 165 |
Comments | 1 | 8/22/2013 | PILING/PILE LOG | PASS (Full) | | 187 |
Comments | 1 | 8/22/2013 | REINF STEEL-GRADE BEAM &/OR PILE CAP | PASS (Full) | | 188 |
Comments | 1 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 195 |
Comments | 2 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 196 |
Comments | 3 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 197 |
Comments | 4 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 198 |
Comments | 5 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 199 |
Comments | 6 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 200 |
Comments | 7 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 201 |
Comments | 8 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 202 |
Comments | 9 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 203 |
Comments | 10 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 204 |
Comments | 11 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 205 |
Comments | 12 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 206 |
Comments | 14 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 208 |
Comments | 15 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 209 |
Comments | 16 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 210 |
Comments | 18 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 212 |
Comments | 19 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 213 |
Comments | 23 | 8/22/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 217 |
Comments | 20 | 8/23/2013 | INSULATION | PASS (Full) | | 160 |
Comments | 13 | 8/23/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 207 |
Comments | 17 | 8/23/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 211 |
Comments | 20 | 8/23/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 214 |
Comments | 21 | 8/23/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 215 |
Comments | 22 | 8/23/2013 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 216 |
Comments | 19 | 9/13/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 182 |
Comments | 19 | 9/16/2013 | INSULATION | PASS (Full) | | 159 |
Comments | 22 | 9/16/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 185 |
Comments | 22 | 9/18/2013 | INSULATION | PASS (Full) | | 162 |
Comments | 22 | 9/24/2013 | DRYWALL | PASS (Full) | | 139 |
Comments | 14 | 10/15/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 177 |
Comments | 1 | 10/21/2013 | INFO-STRUCTURAL | PASS (Full) | | 225 |
Comments | 19 | 10/22/2013 | DRYWALL | PASS (Full) | | 136 |
Comments | 23 | 10/29/2013 | INSULATION | PASS (Full) | | 163 |
Comments | 23 | 10/29/2013 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 186 |
Comments | 14 | 11/5/2013 | DRYWALL | PASS (Full) | | 131 |
Comments | 23 | 11/8/2013 | DRYWALL | PASS (Full) | | 140 |
Comments | 20 | 2/13/2014 | DRYWALL | PASS (Full) | | 137 |
Comments | 21 | 2/13/2014 | DRYWALL | PASS (Full) | | 138 |
Comments | 21 | 2/13/2014 | INSULATION | PASS (Full) | | 161 |
Comments | 20 | 2/13/2014 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 183 |
Comments | 21 | 2/13/2014 | FRAMING-WALL(E,M,P APPROVED?) | PASS (Full) | | 184 |
Comments | 1 | 3/4/2014 | ENGINEERING FINAL FOR PCO | PASS (Full) | | 228 |
Comments | 1 | 2/13/2015 | FINAL - PLANNING (INCLUDES LANDSCAPING) | PASS (Full) | | 190 |
Comments | 1 | 2/13/2015 | STRUCT. FINAL FOR T.C.O.(NEED COMMENTS!) | PASS (Full) | | 221 |
Comments | 1 | 2/13/2015 | ENGINEERING FINAL FOR TCO | PASS (Full) | DANIEL CESCON | 223 |
Comments | 1 | 2/13/2015 | FINAL - PLANNING (INCLUDES LANDSCAPING) | PASS (Full) | | 224 |
Comments | 1 | 2/13/2015 | STRUCT FINAL FOR P.C.O. (IDENTIFY AREA!) | PASS (Full) | | 227 |
Comments | 1 | 2/13/2015 | FIRE FINAL FOR P.C.O. (IDENTIFY AREA) | PASS (Full) | | 229 |
Comments | 1 | 2/13/2015 | FINAL- ENGINEEERING | PASS (Full) | DANIEL CESCON | 230 |
Comments | 1 | 2/13/2015 | PROVIDING 24 HR NOTIFICATION PRIOR TO COMMENCEMENT OF WORK IN ROW TO ENGINEERING | PASS (Full) | DANIEL CESCON | 231 |
Comments | 1 | 2/18/2015 | FINAL-STRUCTURAL | PASS (Full) | | 226 |
Comments | 1 | 2/20/2015 | FIRE FINAL FOR T.C.O. (COMMENTS) | PASS (Full) | | 222 |
Comments | 1 | 2/20/2015 | FINAL FIRE BUREAU INSPECTION | PASS (Full) | | 232 |